A 10 cm by 13 cm, wooden framed document dated Feb. 17, 1954, authorizing Dr. D.A. Keys “To operate controls associated with the N.R.X. Control System in accordance with N.R.X. Policy 1-2”. The authorization was given, and is signed, by G. (Gib) M. James, Superintendent of the NRX Reactors Branch. This was a historic event in that it allowed Dr. Keys to initiate the restart procedure of NRX after the serious accident of December 1952.