A 28 cm by 43 cm, laminated, colour-coded, diagram of the Tandem And SuperConducting Cyclotron (TASCC) beam-delivery system with each of the elements identified. Beam could be delivered to the experimental rooms either directly from the tandem accelerator or it could be routed to the superconducting cyclotron for acceleration to higher energies before being sent to the experimental areas. Elements were required along the entire complex beamline to steer, focus and measure the beam. The TASCC facility produced its last beam on 14 February 1997 after which it was decommissioned and dismantled, largely for scrap metal recycling.